CAMPBELL CASSETTA
Addition and Alterations

Floral Park-Bellerose Elementary School

  • YEAR :
  • LOCATION :
  • CATEGORY :
  • CREATIVE DIRECTOR :
  • VISUALIZATION :
  • Project: : Floral Park-Bellerose Elementary School Addition and Alterations
  • Client: : Floral Park-Bellerose UFSD
  • Consultants: : MEP: Bladykas Engineering PC Structural: TDM Engineering PC
  • Size: : 15,000 Square Feet
  • Cost: : $7.5 Million
  • Completion Date: : September 2021

Project: Floral Park-Bellerose Elementary School
Addition and Alterations

Summary:
Design and construction of an 8 classroom, 2 story addition with storage space on the lower level. Much attention and detail was given to emphasize and maintain the classic architectural facade of the original building while introducing modern material and new technology. 2 nd Floor STEM classroom spaces were designed with acoustical roof decks, exposed structure and MEP systems, large skylights, folding partitions and polished concrete floors to encourage learning and collaboration. A 2-story connecting corridor overlooks a new open courtyard and play area.

Client: Floral Park-Bellerose UFSD

Consultants:
MEP: Bladykas Engineering PC
Structural: TDM Engineering PC

Size: 15,000 Square Feet

Cost: $7.5 Million

Completion Date: September 2021