Project: John Lewis Childs Elementary School Addition
Summary:
Design and construction of an 8 classroom, 2 story addition with storage + multi-purpose space on lower level. Much attention and detail was given to emphasize and maintain the classic architectural facade of the original building while introducing modern material and technology. 2nd Floor STEM classroom spaces were designed with exposed structure and MEP systems, large skylights, folding partitions and polished concrete floors to encourage learning and collaboration.
Client: Floral Park-Bellerose UFSD
Consultants:
MEP: Bladykas Engineering PC
Structural: TDM Engineering PC
Size: 15,000 Square Feet
Completion Date: September 2021